- Product Categories
- Friendly Links
- home > Supply > Supply of plastic running construction | Baoding, Tianjin plastic run construction Handan plastic running laying | Changgiakou, plastic run specifications
Supply of plastic running construction | Baoding, Tianjin plastic run construction Handan plastic running laying | Changgiakou, plastic run specifications
Information Name: | Supply of plastic running construction | Baoding, Tianjin plastic run construction Handan plastic running laying | Changgiakou, plastic run specifications |
Published: | 2012-04-10 |
Validity: | 365 |
Specifications: | Tianjin plastic run construction Handan plastic run construction the Baoding plastic run laying | Zhangjiakou plastic run specifications |
Quantity: | 100000.00 |
Price Description: | |
Detailed Product Description: | The tennis court is a rectangular space, length of 36.58 meters, 18.29 meters wide. The court surrounded by four-meter-high fence surrounded the convenience of picking the ball. Stadium lighting should adopt the average distribution of the eight 1000-watt lamps on both sides of the court, illumination of 350LUX, with a tennis net post, net central 0.914 m high. Push the water and the windbreak should be necessary for an outdoor tennis court stadium facilities. The popular practice of tennis: lawn venue, hard-grounds and clay courts. The underlying general asphalt concrete layer of the main practices of the tennis scene turf, red land, acrylic (hard acrylic / flexible acrylic acid) coating. First of all, due to the conservation of the natural grass is difficult, costly, especially in northern China Four Seasons a large temperature difference, so it is rarely used. Secondly, on clay court in addition to professional teams, the general training and competition is rarely used. Again, hard to the site of the surface layer of acrylic (hard acrylic / elastic coating of acrylic acid), popular hard-surface tennis courts (the U.S. Open, Australian Open \ in the network) using acrylic paint. The U.S. Open was founded in 1881, using medium speed acrylic hard-surface tennis courts, the U.S. network linked the National Tennis Center selection of acrylic tennis courts (hard acrylic / elastic acrylic acid) coating of sports venues material systems for the U.S. Open venue. This coating can be used on asphalt or concrete substrate. Depending on the hardness and the ball can be divided into two series of hard and padded elastic. The main structure of hard-Series: the adhesive layer, layer of texture, surface color layer and the paint line. Cushion series between the adhesive layer with the texture layer by adding coarse, thin layer of rubber layer. The main advantage of the acrylic paint: (1) a very competitive cost performance. (2) color selection, strong wear resistance. (3) non-toxic, environmentally friendly, resistant to ultraviolet irradiation. (4) maintenance facilities, and long service life. To sum up, acrylic (hard acrylic / elastic acrylic acid) coating is the material of choice in the tennis scene layer. The main brands are: Courtwell Tennislife DECOTURF. And while Courtwell the Chinese Tennis Association is authorized to license the Chinese Tennis Association (CTA) flag abroad with a new ground material - suspension assembly sports flooring, because of its damping performance using the time limit (the effective absorption of 90% of the vertical impact force), safe, easy to install, suitable for a variety of sports, but also more and more star hotels, private clubs, schools and other large and medium-sized customer favorite. Acrylic tennis court acrylic acid resin tennis courts for competition and training of professional athletes. Tennis court site to build the basic process: The first step: planning, site selection. Before construction of any project, the first step is to develop a detailed plan. If you want to build a tennis court, before carrying out the project, the first question you must consider is the surface of the tennis courts should be taken to the surface layer? Or modern synthetic plastic surface of the soil surface? Two types of advantages and disadvantages, but the synthetic surface material in recent years has been very good improvement, and its advantages are very obvious. Acrylic plastic surface has been widely used and recognized. Second, we must be selected to determine the address of the tennis courts, and its surrounding environment, planning the most reasonable construction program. The main considerations are: the site soil conditions, the thickness of the permafrost, the location of groundwater, the direction of the court, cement or asphalt-based selection, multi-piece golf course connected to the time and space interval size. Construction of tennis courts to be adapted to local conditions, but we have to spend a minimum of 19 × 37m venue. Step two: Foundation construction. , To start out of the planning and design of the foundation construction. Quality level of a tennis court, largely depends on the quality of infrastructure. Therefore, the basic construction must select the basis of professional construction team building, according to the requirements of the site-based construction in strict accordance with construction standards, strict checks. The site-specific basis of the requirements are: Cement foundation, that is, the reinforced concrete foundation. It to use commercial concrete laying success. With reinforced in order to increase site integrity, to prevent the cracking of the basis. General, each piece of the pitch below the net should leave an expansion joint. Asphalt base according to local environmental conditions, down from the ground to dig the appropriate depth, and different materials in order to fill the shop, and gradually RCC, so that its density is not less than 2.35 tons / cubic meter. The surface asphalt surface Ma, no cellular, no oil pollution, and to ensure that the oil back in the summer heat. Cement foundation and asphalt surface of the base, the flatness of the height difference is not greater than 3 mm, 2 meters, pressure foot presence on the ground is to use any measurements to check the flatness error of the mean value is not greater than 3 mm. For the outdoor stadium, surface drainage slope of 1:100 to 1:150 (as distinguished from ordinary civil drainage slope). In addition, the basic construction, we must prepare in advance some of the ancillary facilities fixtures embedded in order to avoid omitted to be done in the future would undermine the basis of the integrity of the redo. The third step: the construction of tennis courts and venues around the backstop, tennis walls, lighting systems and other ancillary facilities. After the completion of the infrastructure, according to some of the embedded facilities, the installation of stadium around the backstop and lamp posts, and as much as possible to arrange the construction side of the tennis wall, thought exercise of will. Step 4: ground floor laying. Venues basic maintenance is completed, and other ancillary facilities are properly installed, the next to do the tennis courts is the most critical part of the surface layer. Although for a different basis, there are some different ways of handling and laying of all products are not the same, but overall, the laying of the surface layer are mainly the following steps: A. Clean-up and repair basis venue: to patch some potholes, depression, and then clean or scour the entire site, you need to pay attention to is that the repaired site, be sure to dry (usually 24 hours) before continue with the work. Two. Shop the adhesive layer: the need to shop in the underlying surface coated with adhesive, it closely bonded to the cement surface, at the same time and the surface layer of plastic material, but also to prevent unglued from the skin and other issues. 3. Shop the basis of the enhancement layer: In order to enhance the strength of the site, the flatness and service life, the plastic surface of the main raw material for acrylic and quartz sand, water, stirring to blend into an emulsion by a certain percentage, even laying the presence of the ground. 4. Shop fill layer: add the appropriate quartz sand mixed with acrylic color layer base material mixed paved and mixed with quartz sand is not only wearable, but can also be adjusted according to the amount of control the speed of the ball. 5 The surface of the laying of oil: the acrylic surface oil with a certain proportion of water mixed evenly spread on the fill layer. It's colorful, anti-UV fade, and abrasion resistance. Step 5: drawing a line, hanging on. After the laying of the surface oil, it is necessary to the plastic surface the last step in the process - drawing a line. It should be noted that in drawing a line, must be in strict accordance with the standard size pre-painting the excellent line of two small thin, and cross-checked. The review is correct, adhesive stickers attached to the two small thin lateral, and then dedicated venue for drawing lines and paintbrushes in them. Then torn plastic stickers, and finally install Internet column, hang up the tennis nets and center pull with. At this point, after more than five steps, a standard tennis court even if the construction is completed. |
Admin>>>
You are the 6575 visitor
Copyright © GuangDong ICP No. 10089450, Tianjin to build bright Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 6575 visitor
Copyright © GuangDong ICP No. 10089450, Tianjin to build bright Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility